Customer: Government
Location: Nuclear Power Plant(s). Eastern Europe.
Risk: High.
Centra was asked to design, deliver, Install and commission a comprehensive system to a secluded site(s) in difficult working environments. The sites required a comprehensive solution to Include perimeter protection consisting of electrical fencing, IR Beams, CCTV and other measures. Internal security was access control, alarms and more cctv. Turnstiles and gates help form solid counter measures to any planned assault.
The system was integrated back into a security control room which was supplied and constructed on site by Centra. With the help of local labour the Installation was completed on time and to budget.

2 Comments:
please give me more in fo on this
please send details
Post a Comment
<< Home